JDK 7

Milestones

The JDK 7 development schedule is divided into a sequence of milestone cycles, most five to ten builds in length, with builds occuring roughly once each week. There will be no formal beta or early-access releases, as in the past. Major features and other potentially-destabilizing changes will targeted for integration early in a specific milestone.

Here is the current high-level milestone schedule, with the features targeted to each cycle:

M1 2009/01/02 – 2009/02/19 (b48) 7 builds
Gervill sound synthesizer
Use the Windows Vista IPv6 stack
(ALL CHANGES)
M2 2009/02/20 – 2009/04/02 (b53) 5 builds
JSR 203: More new I/O APIs for the Java platform (NIO.2)
Method to close a URLClassLoader
(ALL CHANGES)
M3 2009/04/03 – 2009/05/14 (b59) 6 builds JavaOne Preview
Create new platform APIs for 6u10 graphics features
JSR 292: Support for dynamically-typed languages (InvokeDynamic)
Nimbus look-and-feel for Swing
SCTP (Stream Control Transmission Protocol)
SDP (Sockets Direct Protocol)
Upgrade class-loader architecture
(ALL CHANGES)
M4 2009/06/05 – 2009/07/23 (b66) 7 builds
(ALL CHANGES)
M5 2009/07/24 – 2009/11/12 (b76) 10 builds
Concurrency and collections updates (jsr166y)
Elliptic-curve cryptography (ECC)
Swing JLayer component
(ALL CHANGES)
M6 2009/11/27 – 2010/02/18 (b84) 8 builds
(ALL CHANGES)
M7 2010/02/26 – 2010/04/15 (b89) 5 builds
(ALL CHANGES)
M8 2010/04/16 – 2010/06/03 (b96) 7 builds
(ALL CHANGES)
M9 2010/06/04 – 2010/07/29 (b103) 7 builds
Strict class-file checking
XRender pipeline for Java 2D
(ALL CHANGES)
M10 2010/07/30 – 2010/09/09 (b109) 6 builds
(ALL CHANGES)
M11 2010/09/10 – 2010/12/23 (b123) 14 builds Feature Complete
JDBC 4.1
JSR 334: Small language enhancements (Project Coin)
Locale enhancement
NIO.2 filesystem provider for zip/jar archives
Separate user locale and user-interface locale
TLS 1.2
Unicode 6.0
(ALL CHANGES)
M12 2010/12/31 – 2011/02/17 (b130) 7 builds Developer Preview
Update the XML stack
(ALL CHANGES)
M13 2011/02/18 – 2011/06/02 (b145) 15 builds Last scheduled build
Enhanced MBeans
(ALL CHANGES)

One or more release-candidate builds will be declared after the last scheduled build, aiming for the General Availability release on 2011/7/28.

Last update: 2011/7/28 08:19 -0700